Home
\
Society
\
Municipal workers are preparing for the heating season
Society
Municipal workers are preparing for the heating season
Published 29.09.2017
1505

Public utility institutions of Turkmenistan conduct planned activities in preparation for the heating season 2017-2018. In order to ensure the uninterrupted functioning of heat supply systems in the winter season, major repairs of heating systems, preparation of specialized equipment were completed, dispatching services were equipped with the necessary equipment and transport. In order to increase the efficiency of municipal services, a consistent upgrade of the equipment of centralized heat supply systems is being carried out.

Last news
15.08
The President of Turkmenistan congratulated the President of the Republic of Korea
15.08
The President of Turkmenistan congratulated the leadership of the Republic of India
13.08
The President of Turkmenistan congratulated the leadership of the Islamic Republic of Pakistan
12.08
Events dedicated to the Caspian Sea Day were held in «Avaza»
11.08
Honoring the Master of the Poetic Word
11.08
Strengthening the constructive dialogue for common creative goals
10.08
Telephone conversation between the Chairman of the Halk Maslahaty of Turkmenistan and the President of the Republic of Azerbaijan
10.08
The total amount of transactions at the SCRMET auctions amounted to over 3 million 301 thousand US dollars
09.08
The President of Turkmenistan congratulated the leadership of the Republic of Singapore
08.08
Culture brings people together
top-arrow