The construction of standby water intake facility for drinking water plant is under completion in Kunyaurgench etrap. The facility includes artesian wells, pump station. Two 2.5-thousand tons water tanks and other necessary units. New enterprises and water lines are built under the general programme for provision of the population of the rural areas with purified drinking water; existing communications are reconstructed and brought to accordance with modern requirements. New drinking water plants are built in Gyorogly, Turkmenbashy and Boldumsaz etraps.