Home
\
Politics
\
Equipment Service and Maintenance Centre to be built at Byuzmeyin Power Station
Politics
Equipment Service and Maintenance Centre to be built at Byuzmeyin Power Station
Published 24.05.2019
2043

The President of Turkmenistan signed the Resolution assigning the State Power Energy Corporation Türkmenenergo of the Ministry of Energy to sign the contract for provision of construction of the Energy Equipment Service and Maintenance Centre with external engineering communication on the territory Byuzmeyin State Power Station; the contract for provision of spare parts for gas turbine units with the Consortium of Çalik Enerji Sanayi ve Ticaret A.Ş (The Republic of Turkey) and Çalik Enerji Swiss AG (Swiss Confederation). The document assigns to start the construction in June 2019 and to compete the centre with full operational readiness by June 2022.

Last news
25.11
The President of Turkmenistan congratulated the Sultan of Oman
24.11
Turkmenistan considerably strengthens its positions as an important transport-logistics and communication bridge
24.11
A briefing dedicated to the Year of International Law and cooperation between the UN and the CIS was held at the Ministry of Foreign Affairs of Turkmenistan
23.11
President of Turkmenistan Held a Working Meeting
23.11
The President of Turkmenistan Received the Deputy Secretary of State of the United States
23.11
The total amount of transactions at the SCRMET auctions exceeded 37 million 691 thousand USA dollars
22.11
The President of Turkmenistan congratulated the Emir of the State of Qatar
22.11
The list of exhibitions, fairs, conferences and festivals for 2027 has been approved
22.11
For the attention of the deputies of the Mejlis of Turkmenistan
22.11
Days of European culture took place in the capital
top-arrow