Home
\
Politics
\
Equipment Service and Maintenance Centre to be built at Byuzmeyin Power Station
Politics
Equipment Service and Maintenance Centre to be built at Byuzmeyin Power Station
Published 24.05.2019
959

The President of Turkmenistan signed the Resolution assigning the State Power Energy Corporation Türkmenenergo of the Ministry of Energy to sign the contract for provision of construction of the Energy Equipment Service and Maintenance Centre with external engineering communication on the territory Byuzmeyin State Power Station; the contract for provision of spare parts for gas turbine units with the Consortium of Çalik Enerji Sanayi ve Ticaret A.Ş (The Republic of Turkey) and Çalik Enerji Swiss AG (Swiss Confederation). The document assigns to start the construction in June 2019 and to compete the centre with full operational readiness by June 2022.

Last news
10.09
Halk Maslahaty is the driving force of society in solving priority problems
09.09
President Serdar BERDIMUHAMEDOV: Turkmenistan is attached to practical steps on realisation of joint possibilities for common interests, consolidation of friendship, good neighbourhood and trust
08.09
President Serdar Berdimuhamedov took part in the opening ceremony of a new industrial facility
08.09
Resolution of the Mejlis of Turkmenistan
08.09
The total amount of transactions at the SCRMET auctions amounted to over 3 million 825 thousand US dollars
08.09
Halk Maslahaty is a symbol of national unity of Turkmenistan
07.09
The “Yaňlan, Diýarym!” TV Contest Completed
07.09
The President of Turkmenistan congratulated the President of the Federative Republic of Brazil
07.09
The Winners of the “Ýaňlan, Diýarym!” TV Competition Have Been Announced
07.09
The “Yaňlan, Diýarym!” TV Contest Completed
top-arrow