Home
\
Official
\
The material and technical base of the plant will be strengthened at the Seydi Oil Refinery
Official
The material and technical base of the plant will be strengthened at the Seydi Oil Refinery
Published 21.12.2024
4912

In order to successfully fulfill the tasks set before the domestic oil and gas industry, in the era of the Revival of the new epoch of the powerful state, the President of Turkmenistan signed a Resolution, allowing the State Concern «Türkmennebit» to carry out the relevant work to further strengthen the material and technical base of the installation at the Seydi Oil Refinery.

Last news
12.10
The total amount of transactions at the SCRMET auctions amounted to over 145 million 11 thousand USA dollars
10.10
Turkmenistan Expands Its Sanatorium and Health Resort System
10.10
An international exhibition and scientific conference dedicated to Healthcare and Medical Industry Workers Day of Turkmenistan opened in Ashgabat
10.10
New healthcare facilities have been commissioned in the Turkmen capital
09.10
Hero-Arkadag took part in the opening ceremony of the new building complex at the «Archman» Sanatorium
08.10
Meeting between the President of Turkmenistan and the President of the Republic of Uzbekistan
08.10
Meeting between the President of Turkmenistan and the President of the Republic of Azerbaijan
08.10
Meeting was held between the President of Turkmenistan and the President of the Russian Federation
08.10
Meeting between the President of Turkmenistan and the President of the Republic of Kazakhstan
08.10
Meeting between the President of Turkmenistan and the President of the Kyrgyz Republic
top-arrow