Home
\
Politics
\
Singapore company to build gas compressor station at Zäkli-Derweze
Politics
Singapore company to build gas compressor station at Zäkli-Derweze
Published 23.08.2019
1884

The President of Turkmenistan signed the resolution, having approved the State Concern Türkmengaz to sign the contract with GP Global Equipment Pte. Ltd (The Republic of Singapore) on project design and construction of gas compressor station with annual output capacity of 2 billion cubic meters of gas at gas treatment facility Zäkli-Derweze of the complex of Merkezi Garagum gas condensate deposits. The document assigns to start the construction in September 2019 and to commission the facilities with full readiness to operate in February 2022.

Last news
15.08
The President of Turkmenistan congratulated the President of the Republic of Korea
15.08
The President of Turkmenistan congratulated the leadership of the Republic of India
14.08
Continuity of Spiritual Traditions
14.08
The President of Turkmenistan congratulated the leadership of the Islamic Republic of Pakistan
13.08
The “Arkadag” Team Prepares for New Victories
12.08
The President of Turkmenistan congratulated the Prime-minister of the Republic of Armenia
12.08
The President of Turkmenistan sent condolences to the President of the Republic of Colombia
12.08
The scientific and practical conference on the occasion of the Caspian Sea Day
11.08
The total amount of transactions at the SCRMET auctions amounted to over 224 thousand USA dollars
10.08
Working Visit of the Hero-Arkadag to the Mary Velayat
top-arrow